Heritage Park North
Welcome to your neighborhood webpage brought to you by the City of Allen’s Community Enhancement Department. “For the Good of Your Neighborhood” initiative provides non-HOA neighborhoods with technical assistance to help start their neighborhood groups.
- “Where We've Been” gives the history of our initial project and how we got to this point.
- “Current Project Updates” provide recent updates for onging projects.
- “Your Neighborhood Groups” lists the different groups organized by your neighbors.
- "Other Resources" list local orgs and other resources focused on the art of neighboring.
- “Community Board” is for neighborhood interaction.
Phases
Current Project Updates
Leveraging off the process described on tab one, City staff used a combination of resident feedback and a physical assessment to create a long-term neighborhood improvement plan. Tab #2, “Current Project Updates,” provides updates on those items.
Heritage Parkway North of E. Bethany Dr. to Park Place Dr. - UPDATE
Refer back to Tab #1 for additional background.
This project is a joint effort between the Engineering and Community Enhancement Departments to address improvements requested through neighborhood meetings and surveys.
Construction is scheduled to begin on July 20, 2026, and finish by mid-September 2026, with the goal of completing the roadwork by mid-August to minimize disruption to the start of the school year.
Work will take place in two phases: crews will complete improvements on the east side of the roadway and parkway, then move to the west side. Both phases will take 3-4 weeks each. Once all street and sidewalk concrete work is complete, sod will be installed to restore the area.
Key Improvements:
- Roadway repairs between Monroe Ct. and Park Place Dr. to replace deteriorated concrete panels.
- Expansion of the parkway (grass area) between Monroe Ct. and Park Place Dr. and striping from Monroe Ct. to Bethany Dr. may reduce speeding in the area due to narrowing the roadway (even with a reduction, it will remain wider than a typical residential street). Note: The intersection of Heritage Parkway and Park Place Dr. will remain at full width to accommodate turning vehicles as seen below.
- Expansion of the parkway allows for wider sidewalks and increased greenspace.
Questions should be directed to Adam Williams, Graduate Engineer, in the Engineering Department, at 214-509-4586 or Adam.Williams@allentx.gov.

See the attached PDF at the bottom of the page for additional neighborhood improvement updates.
Events
Past events
Event date: February 21st, 2025 from 1:00 AM to 2:15 AM.
5705 Cheyenne Dr
Event date: March 11th, 2025 from 12:30 AM to 1:15 AM.
Event date: March 25th, 2025 from 12:30 AM to 1:30 AM.
Event date: April 26th, 2025 from 1:00 PM to 5:00 PM.
9 registrants