Oak Hill
Jupiter Sanitary Sewer / Oak Hill Waterline Replacement Project: Construction is scheduled to begin May 2026 and end in early 2027. See "Current Project Updates" below to stay informed.
Welcome to your neighborhood webpage brought to you by the City of Allen’s Community Enhancement Department. “For the Good of Your Neighborhood” initiative provides non-HOA neighborhoods with a platform to share information and technical assistance to help start their neighborhood groups.
- “Where We've Been” gives the history of our initial project and how we got to this point.
- “Current Project Updates” provide recent updates for ongoing projects.
- “Your Neighborhood Groups” lists the different groups organized by your neighbors.
- "Other Resources" list local orgs and other resources focused on the art of neighboring.
- “Community Board” is for neighborhood interaction.
Phases
Current Project Updates
Leveraging off the process described on tab one, City staff used a combination of resident feedback and a physical assessment to create a long-term neighborhood improvement plan. Tab #2, “Current Project Updates,” provides updates on those items.
Waterline Project Construction Updates - May 2026 through Early 2027
This project is a partnership between the Engineering and Community Enhancement Departments. It addresses several of the “future needs/improvements” mentioned by residents in the neighborhood meeting and survey in February 2025. Specifically, tree removal, sidewalk improvements, and additional lighting throughout the neighborhood.
Project information will be posted below throughout the duration of the project. Questions should be directed to Jamie Altman, Project Manager in the Engineering Department, at 214-509-4587 or jamie.altman@allentx.gov.
- A detailed project overview can be found here.
- Residents can view the pre-construction meeting video and slideshow below:
FAQs
Where is the funding coming from? The Purchasing Division advertised an Invitation for Bid #2026-2-33 & Jupiter/Oak Hill Water & Sanitary Sewer Replacement and opened on March 19, 2026, to Jupiter/Oak Hill Water & Sanitary Sewer Replacement. There were five responsive bids received. J&L Construction LLC had the lowest price proposal and calendar day bid while meeting the required work experience and receiving approval via reference checks.
The funding sources for this project include the Water and Sewer fund for $4,705,880 and 2023 Go Bonds for $530,720. The Capital Improvement Plan can be found on the City’s webpage.
Will my mailbox be replaced? Mailboxes will not be replaced. In the event of unexpected damage, the contractor will repair or replace mailboxes as needed.
Will all trees be removed in the right of way between the sidewalk and curb? Trees in the City’s Right-of-Way (ROW) will be removed and stumps ground to ensure the new sidewalks remain in good repair for as long as possible.
Who can I talk to if I recently paid to trim my trees located between the sidewalk and curb as the result of a Code Compliance notice? If you trimmed your trees in the City’s Right-of-Way (ROW) between the dates of January 13-May 8, 2026, please contact Erin Jones, Assistant Director of Community Enhancement, at 214-509-4176 or ejones@allentx.gov to discuss further.
Why are the sanitary sewer lines within Oak Hill not being replaced? The sanitary sewer line pipes are not in a condition that needs to be replaced.
Why is the water main on Bethany not being replaced? The water main on Bethany was replaced in 2003 and has not exceeded the life expectancy.
Events
Past events
Event date: February 28th, 2025 from 1:00 AM to 2:15 AM.
800 South Jupiter Road
Event date: March 31st, 2025 at 11:30 PM to April 1st, 2025 at 12:15 AM.
Event date: October 4th, 2025 from 8:00 PM to 10:00 PM.
703 S Greenville Ave
1 registrant

